TURN AROUND MANAGEMENT
- Equipment Strategy
- Process Master Plan
- Contracting
- Planning and Cost Estimate
- Time and resources Scheduling
- Risk Analysis with Monte Carlo Method
- Field Organisation
In an economic outlook that remains challenging, the ability to plan and schedule an efficient, safe and cost-effective turn-around contributes to project margins of our client.
- Preparing the preliminary work list
- Execution of Job Cards and Cost estimates by frame contracts
- Execution of Job Pack that includes all the equipment informations
SCHEDULING is characterised by Pert development of each item using Primavera P6 v7 or MS Project outputs are:
- Critical and sub-critical paths
- Manhours/Manpowers for each skill
- Legal inspection path
Other main documents are:
- Logistics
- lifting plan
- interference overlapping
The distributions of activities with Best Case, Most likely case and Worst Case duration are included in the calculations.